California ADU fees
California ADU fees: what the state lets a city charge
California limits the fees on an ADU by size: no impact fees on a unit of 750 square feet or less, no school fees on 500 square feet or less, and water and sewer charges only in proportion to the unit, or none for a conversion of existing space.
Permit and plan check fees still apply, and each city sets its own.

Which ADU fees are set by state law?
The fee rules sit in Gov. Code § 66311.5. A 2025 law renumbered them; older articles cite § 66324, which is the same rule under its earlier number. The Department of Housing and Community Development (HCD) explains them in its ADU Handbook, last updated in March 2026, and the table below follows the handbook.
| Fee | What the law says | Source |
|---|---|---|
| Impact fees (including Quimby park fees) | None on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less. Above 750 sq ft, in proportion to the main home's square footage. | Gov. Code § 66311.5(c) |
| School fees | A district may charge an ADU over 500 sq ft; it is not required to. 500 sq ft or less is not subject to them. | Ed. Code § 17620 |
| Water and sewer connection fees, capacity charges | None for an ADU in existing space or a JADU, unless built with a new single-family home. Other ADUs: in proportion to the ADU's size or drainage fixture units compared with the main home. | Gov. Code § 66311.5(b), (e) |
| Building permit and plan check | Set by each city's fee schedule, usually by size or value of the work. | Local fee schedule |
How the proportional impact fee works
Above 750 square feet, a city may charge impact fees, but only a share. HCD's handbook gives an example: a 1,000 square foot ADU next to a 2,000 square foot home "could result in 50 percent of the impact fee" the city would charge for a new primary home. The share follows the ratio of the two floor areas. A unit at 751 square feet therefore does not pay the full fee, but it does move from zero to a real number, which is why the 750 line shows up so often in ADU plans.
Impact fees fund things like parks, roads and public facilities, and each city sets its own schedule. To know the dollar amount for your lot, ask the city for its current impact fee schedule and apply the ratio, or ask for a fee estimate.
School fees and the 500 square foot line
School districts in California collect developer fees on new homes under Education Code § 17620. For ADUs, HCD's handbook says districts may charge units over 500 square feet, and units of 500 square feet or less are not subject to them. Some cities describe their own local rule on their pages; San José's ADU fee page, for example, says school and parkland fees do not apply under 750 square feet. When a city's page and the handbook read differently, ask the city and the school district which rule they apply to your permit.
Water and sewer: when a connection fee applies
Utility charges are where conversions save the most. An ADU built inside existing space, such as a garage or a basement, and any junior ADU, is not a "new residential use" for calculating connection fees or capacity charges, unless it is built at the same time as a new single-family home. For a new detached ADU, a water or sewer provider may charge, but only in proportion to the burden: the ADU's square footage or its drainage fixture units compared with the main home.
For what the fee relief leaves in a junior ADU budget, line by line, read our guide to junior ADU cost.
Fees are not the same as construction. The trench, pipe and any new meter or lateral still cost money to build, and no official source publishes typical ranges for that work. Get it priced as its own line in a bid, and see our ADU cost guide for the other lines.
How long the city has to review an ADU permit
State law also sets the clock. The city must decide whether an application is complete within 15 business days, and must approve or deny a complete application within 60 days when there is already a home on the lot. A denial has to come with written comments within those 60 days, so you know what to fix. Time matters to cost: holding a loan or paying rent elsewhere while a permit waits adds up.
Pre-approved plans: a fee and time saver
Under AB 1332 (§ 65852.27), every California city had to set up a program for pre-approved ADU plans by January 1, 2025, and post the plans online. Using one can cut the design line and the review time. Two Bay Area examples show what the numbers look like:
- San José says its preapproved plans give "the fastest and lowest-cost permit process", and offers a free fee estimate with Form 337; the building permit fee depends on the ADU's size.
- City of San Mateo, in its guide revised January 13, 2025, lists a site-specific application fee of $1,455.43 for a pre-approved ADU, and a pre-approval fee of $2,831.57 paid by the designer who submits a plan to the gallery.
A pre-approved plan still needs a site plan, utility connections and setbacks for your lot. More on the region is on our Bay Area ADU cost page; Texas has no matching state rules, covered on ADU cost in Dallas–Fort Worth.
California ADU fees
Not sure which fees apply to your ADU?
Tell us the city, the kind of ADU and roughly how big it will be. We call or email you back to go through the budget lines; asking costs nothing.
Ask which fees apply to your ADU
A few lines are enough: the kind of ADU you have in mind, roughly how big, and the city or ZIP. We call or email you back to go through the budget lines; sending this costs nothing.
California ADU fee questions
Do I pay impact fees on a 750 square foot ADU?
No. Under Gov. Code § 66311.5(c) a city or special district may not charge impact fees on an ADU of 750 square feet of interior livable space or less. At 751 square feet and up it may charge, but only in proportion to your main home's size.
Does a garage conversion pay a sewer connection fee?
Not under state law, as long as the ADU is built within existing space and not together with a new single-family home. It is not treated as a new residential use for connection fees or capacity charges, though any new pipe work still has to be built and paid for.
Can a city charge plan check fees on an ADU?
Yes. The state limits impact, school and utility charges, but building permit and plan check fees come from each city's own schedule. Pre-approved plans often lower them; ask the city for a written fee estimate before you commit to a design.
Sources: California Department of Housing and Community Development, ADU Handbook (March 2026); City of San José, Fees for ADUs and Preapproved ADUs; City of San Mateo, Pre-Approved ADU Application Guide (revised 2025-01-13).