ADU cost: what building an accessory dwelling unit really costs

The most cited answer comes from UC Berkeley's Terner Center: in its 2021 statewide survey of California ADU owners, the median ADU cost $150,000, or about $250 per square foot. Behind that one number sit eight or so separate cost lines, and the size, type and lot of your unit decide which of them are large and which almost disappear.

AI illustration, not a photo of a real project: a garage converted into a finished studio ADU with white walls, a light oak floor, a compact kitchen and a small sofa
AI illustration Not a photo of a real project.

How much does an ADU cost? The survey numbers

The Terner Center's 2021 survey asked California homeowners who had already built an ADU what they spent. The median was $150,000, which works out to roughly $250 per square foot. The spread was wide: 37 % of the owners spent under $100,000, and 71 % spent under $200,000. That leaves almost three in ten above $200,000.

Two cautions before you plan around those figures. First, the survey reflects projects built before 2021, and labor and material prices have moved since then; treat the median as a reference point, not a price. Second, a median hides the reasons a project lands where it does. A garage converted to a studio and a new two-bedroom cottage at the back of a sloped lot are both "ADUs", and they do not belong in the same budget conversation. The useful move is to break the cost into its lines and price each one for your lot.

The cost lines behind every ADU budget

Every ADU budget, whatever the building method, is made of the same parts. Some are fixed by law, some by the city, and most by the site itself.

  1. Design and engineering. Plans, a site plan, structural and energy calculations, and sometimes a survey or soils report. Pre-approved plans from your city can shrink this line.
  2. Permit and plan check. The building department's fees, usually scaled to the size or value of the work.
  3. Impact, school and utility fees. Set by state law in California, with size thresholds that can bring some of them to zero.
  4. Site work and foundation. Clearing, grading, drainage, access for equipment, and the foundation the unit sits on.
  5. Utilities. Trenching for water, sewer and power, a possible electrical panel or service upgrade, and gas if you use it.
  6. The building itself. Framing, roof, windows, insulation, plumbing and wiring, whether built on site or in a factory.
  7. Finishes. Flooring, cabinets, counters, fixtures and appliances, where choices move the total quickly.
  8. Contingency. Money held back for what nobody sees until the ground is open or a wall comes down.

When two bids for the same ADU differ a lot, the difference is usually in lines four and five, or in what one bid quietly leaves out. Our budget worksheet lists these lines so you can type in each quote and see which are still blank.

Why the price per square foot misleads on small units

A per-square-foot number spreads every cost over the floor area as if all of them grew with size. Many do not. A kitchen and a bathroom cost about the same in a 400 square foot studio as in an 800 square foot one-bedroom. The trench to the street, the sewer connection, the plans, the permit counter visit and the foundation edge all carry fixed costs. So a smaller ADU usually has a higher cost per square foot than a larger one, even when its total is lower.

Use the $250 per square foot survey figure only to sanity-check a total, never to build one. Multiply a small floor area by it and you will likely come in low; multiply a large one and you may come in high.

How size thresholds change what you pay in fees

California's ADU law ties several fees to the unit's size, so a few square feet can matter. Under Gov. Code § 66311.5, a city or special district may not charge impact fees on an ADU of 750 square feet of interior livable space or less. Above 750 square feet, impact fees must be in proportion to the size of the main home. School districts may charge fees only on units over 500 square feet under Education Code § 17620. The details, including how water and sewer charges work, are on our page on California ADU fees.

That is why many owners design to 750 square feet or a little under: it keeps impact fees off the budget. Whether that is the right size depends on what the unit is for, the lot, and what your city allows; state law requires a local ordinance to allow at least 850 square feet, or 1,000 square feet with more than one bedroom.

Lower-fee paths: conversions and junior ADUs

An ADU built inside existing space, such as a garage, a basement or part of the house, often avoids the biggest site costs: there is no new foundation and the structure already stands. State law also says an ADU in existing space, or a junior ADU, is not a "new residential use" for water and sewer connection fees or capacity charges, unless it is built at the same time as a new single-family home.

A junior ADU (JADU) is limited to 500 square feet of interior livable space, inside the home. Because it stays at or under 500 square feet, it is under both the impact fee and the school fee thresholds. Conversions still carry their own costs: bringing an old garage slab, walls and wiring up to the code for a home can be a real line, and that only shows up once someone inspects the space. Our garage conversion cost guide goes through those lines and the state rules on parking, setbacks and utilities.

A garage conversion ADU, step by step

Scroll through the pictures below to watch one garage turn into a small home: the empty garage, a new wall framed in, the pipes and wiring, insulation and drywall, a warm new floor and a finished studio. They are illustrations made with AI to show the usual order of a garage conversion, not photos of a real garage or job. Each of those steps is also a line in the budget, and only an inspection of your own garage shows how big each line is.

Illustration Illustration: a finished garage studio with a light wood floor, a small white kitchen along one wall and a sofa

6 of 6

Finished

A finished studio

Detached, prefab or modular: does the method change the cost?

A detached ADU built on site, a prefab unit or a modular one shares most cost lines: plans, permits, fees, site work, foundation and utilities do not go away when the walls are built in a factory. What changes is how the building line is bought and when it is paid. Our guides on prefab ADU cost and modular ADUs explain what a factory price usually covers and what stays local.

Bay Area and Dallas–Fort Worth: why the same ADU costs differently

California has a statewide ADU law with fee limits; Texas does not have one, so in Dallas–Fort Worth each city's own code sets where an ADU is allowed and what it pays. Labor costs, soil, slope and permit schedules differ by city as well. See ADU cost in the Bay Area and ADU cost in Dallas–Fort Worth for each region's rules, and paying for an ADU for how owners fund the total.

ADU cost guide

Want to go through your own ADU cost lines?

Call, or send the form below with the kind of ADU, roughly how big, and the city or ZIP. We call or email you back to go through the budget lines; asking costs nothing.

Ask us to walk through your ADU cost lines

A few lines are enough: the kind of ADU you have in mind, roughly how big, and the city or ZIP. We call or email you back to go through the budget lines; sending this costs nothing.

ADU cost questions

Is $150,000 a realistic ADU budget today?

It is the median from a 2021 survey of California owners, so it is a fair starting reference, not a quote. Prices have moved since then, and your lot decides the large lines: site work, foundation and utilities. Price each cost line for your property before you settle on a number.

Why does a smaller ADU cost more per square foot?

Because the kitchen, bathroom, plans, utility trench and permit carry fixed costs that do not shrink with the floor area. Spread over fewer square feet, they raise the per-square-foot figure even while the total stays lower than a bigger unit's.

Which cost line surprises owners most often?

Usually site work and utilities: a long trench to the sewer, a slope that needs grading, poor access for equipment, or an electrical panel that cannot carry a second home. These depend on the lot, which is why they belong in every bid as their own line.

How much contingency should an ADU budget hold?

There is no official percentage. Owners and their builders set it by how much is unknown: a conversion of an old garage or a lot with no soils information has more unknowns than a flat lot with utilities nearby. Write the amount down as its own line so it is not spent on upgrades.

Sources: UC Berkeley Terner Center for Housing Innovation, First Ever Statewide ADU Owner Survey (2021-04-22); California Department of Housing and Community Development, ADU Handbook (March 2026).