Approval boundary

State approval evidence and city approval reality, separated clearly.

The supplied plan review letters identify R-22345 and R-22348, dated July 15, 2026, expiring July 14, 2029. They support the California Factory-Built Housing structure story. They do not replace city/county permit review, site plans, foundation design, utility approvals, inspections, or licensed installation.

State FBH approval lane

Understand what California HCD Factory-Built Housing plan approval and insignia logic means for this product before comparing it to generic prefab ADU quotes.

Read state approval page

City permit approval lane

Learn why a city or county still reviews the lot, placement, foundation, utilities, setbacks, fire access, fees, and inspections before a real installation.

Read city approval page

Certificates and standards lane

See which approvals, insignia paths, finish-material certificates, energy-code documents, and component standards matter before a buyer trusts the product packet.

Read certificate hub

Approval and license checklist

See the practical sequence: product documents, site feasibility, local permit intake, contractor-license scope, inspections, and closeout evidence.

Read checklist article

R-22345 source packet

3L three-bedroom ADU with kitchen on right side. Gross area shown in the package: 962.40 sf. Net indoor area shown: 931.63 sf.

Open PDF

R-22348 source packet

1L one-bedroom ADU with kitchen on left side. The PDF includes plumbing, electrical, equipment, and architectural package material.

Open PDF

Truth boundary

The site uses source-backed approval facts only. It does not claim site-ready permit status, local permit issuance, a verified contractor license, or a completed installed quote.

Read boundary guide

Official California context

California HCD describes factory-built housing as a factory-constructed version of a site-built residential building that is transported to its permanent location. HCD also requires factory-built units or components offered for sale in California to carry an HCD insignia before shipment when they fall under the FBH program. Local governments remain important because the project still has a real property, local standards, foundation, utilities, and inspection path.